Energy & Utilities

Generation and distribution assets that cannot afford an unplanned outage.

Power plants, transmission operators, and utilities run capital assets under statutory scrutiny. PredCo brings condition monitoring, emissions evidence, and energy accounting onto one data layer, deployable inside your own perimeter.

  • 25+ plant deployments
  • SOC 2 and ISO 27001
  • Cloud, hybrid or on-prem
AudienceGencos · Discoms · Utilities
FunctionsO&M · Environment · Energy
DeploymentOn-premise · Air-gapped
Avg pilot4–6 weeks
Replace with real photography for this page

AI for energy and utilities starts with the asset that cannot be allowed to trip: the transformer, the feeder, the turbine auxiliary. PredCo fuses vibration, thermal, electrical and SCADA signals into failure predictions per asset, keeps emissions and regulatory returns current from live data, watches switchyards and plant floors on existing cameras, and reads tenders so engineering teams bid on the right ones. Sovereign deployment, on the operator's own infrastructure, is a choice, not a tier.

PredCo is an industrial AI company headquartered in New Delhi. For generation, transmission and distribution operators it predicts failures on turbines, transformers, feeders and substations, assembles statutory emissions and CERC or SERC returns continuously, runs computer vision on existing CCTV for switchyard and plant safety, and reads the tenders operators issue and bid on. Deployed cloud, hybrid or on-prem.

Statutory obligation on one side, asset economics on the other.

Utilities carry a reporting burden that assumes continuous data, on an asset base that was instrumented for control rather than for analytics.

01
CEMS data lives in isolation
Continuous emissions monitoring feeds a compliance display and little else. Reconciling it with production and fuel data is a manual exercise.
02
Outages are discovered, not predicted
Transformers, turbines, and pumps are maintained on statutory intervals rather than on measured condition.
03
Energy accounting is coarse
Auxiliary consumption and distribution loss are reported at aggregate level, which is too blunt to act on.
04
Data cannot leave the perimeter
Critical infrastructure rules restrict cloud analytics, so most modern tooling is simply unavailable.

Who owns this on your side, and what each of them gets

Head of O&M / Chief engineer
Gets: Transformer, feeder and turbine failures seen weeks out; outages planned rather than suffered.
Stops worrying about: A forced outage during peak demand, and the regulator's letter that follows.
Environment & regulatory head
Gets: Stack, water and CERC or SERC returns built from live data, filed on time without a quarterly scramble.
Stops worrying about: A consent breach or a late statutory return.
Head of safety
Gets: Switchyards, plant floors and contractor work zones visible from one screen; permits and PPE counted, not assumed.
Stops worrying about: An electrocution or arc-flash incident on a contractor shift.

How a first deployment runs

Small, measured against your own numbers, and live before the quarter ends. Nothing is promised that the first site cannot show.

Stage 01 of 04

Week 1: the assets that cannot trip

We pick the transformers, feeders or auxiliaries whose failure costs most, and connect the SCADA, DGA, vibration and thermal data you already have. Measured against your own outage log.

Distribution utility · 6 substations · 10 months

A state distribution utility deployed PredCo across six substations to cut transformer failures, close the gap on statutory emissions returns, and bring energy accounting under one governed record.

  • Transformer failure warnings: 47 days median lead time
  • Unplanned substation outages: −38% YoY
  • Statutory return preparation: 12 person-days → 2 person-days
  • Energy accounting reconciled daily instead of monthly
  • Deployed fully on-premise inside the utility network

Deployments are described without naming the operator. We are under confidentiality with every customer on this page.

EnergyPlant 1Line 2
Energy and emissions
EMEnergy manager
Line 2 · Foaming cluster
Metered every 15 s across 5 machines, compared with the 4-week baseline.
Today7 days30 days
Export
Energy today↓ 4.0%
5,740kWh
Baseline 5,980 kWh
Specific energy↓ 2.2%
3.03kWh / unit
Target 3.10 · 1,892 units
Peak demand95%
1,186kW
Contract 1,250 kW
CO₂e this month↓ 3.1%
412t
580 MWh · 0.71 kg / kWh
Production vs energy by machine Units produced Energy, kWh
001250.4k2500.8k3751.2k5001.6kUnitskWh
4121,180M1 2.86 kWh/u
3861,090M2 2.82 kWh/u
4551,320M3 2.90 kWh/u
2981,010M4 3.39 kWh/u
3411,140M5 3.34 kWh/u
Energy by machineToday · kWh
5,740kWh today
  • M11,18020.6%
  • M21,09019.0%
  • M31,32023.0%
  • M41,01017.6%
  • M51,14019.9%
Demand today · kW Today Forecast Baseline Contract
8001,0001,2001,40007:0008:0009:0010:0011:0012:0013:00Contract 1,250 kWNow 11:081,284 kW · 11:201,212 kW
Demand advisorLive
Contract demand1,250 kW
Peak so far1,186 kW · 11:08
Headroom now64 kW
Load factor, today0.81
Forecasting the next 2 hours…
Peak demand in 12 min

1,284 kW at 11:20, 34 kW over contract

Shift M4 start by 20 min
M4 start11:10 → 11:30
Forecast peak1,284 → 1,212 kW
Apply scheduleDismiss
Schedule applied

Peak now 1,212 kW, 38 kW of headroom

M4 start moved by 20 min
M4 start11:30
Shift outputUnchanged
Sent to line supervisorUndo
Schedule updated. Peak avoided, est. 6% lower demand charge.

Coverage out of the box

PredCo maintains validation libraries against the standards and rulebooks that apply to your sector.

CEA regulationsPAT (BEE India)CPCB / SPCB emission normsISO 50001ISO 55000ISO 14001ISO 45001IEC 61850CERC / SERC reporting

Questions O&M and regulatory heads ask.

Not covered here? Ask a PredCo engineer. We reply within one working day.

Yes. Cloud, hybrid or on-prem, including air-gapped, is a deployment choice. Public operators usually run the data layer on their own servers or a sovereign cloud, with detection on edge units at the plant.

Scope a first deployment in energy & utilities.

  1. Tell us one site or plant and what you want to see first.
  2. A PredCo engineer replies within one working day.
  3. We walk through how the first six weeks would run, on your own cameras, equipment or documents.

Tell us about one plant in Energy & Utilities.

What you want to see first, and where. A PredCo engineer replies within one working day with how a first deployment would run.

No cost, no commitment. See our privacy policy.

  • SOC 2 and ISO 27001, with cloud, hybrid or on-prem deployment
  • 25+ plant deployments, international clients across multiple countries
  • A PredCo engineer replies within 1 working day; we sign an NDA before the first call