Government & PSU

Sovereign data infrastructure for public operators.

Public sector undertakings and government operators carry the same operational problems as private industry, under stricter procurement, audit, and data residency rules. PredCo is built to deploy inside your perimeter and to be procured through the process you already run.

  • 25+ plant deployments
  • SOC 2 and ISO 27001
  • Cloud, hybrid or on-prem
AudiencePSUs · Government operators
FunctionsIT · Operations · Procurement
DeploymentOn-premise · Air-gapped · Sovereign
ProcurementTender-ready specification
Replace with real photography for this page

AI for government and PSU operators has to clear three gates before it does anything useful: it must run on the operator's own infrastructure, it must be procurable through a tender, and it must leave an audit trail an RTI request can follow. PredCo is built for those gates: on-prem or sovereign-cloud deployment, licensed software with a documented security posture, and every alert, prediction and declaration stored with its evidence. On top of that it does the operational work: site safety on existing cameras, asset failure prediction, statutory returns and tender reading.

PredCo is an industrial AI company headquartered in New Delhi, part of Panscience Innovations. For PSUs and public infrastructure operators it provides a sovereign data layer deployed on the operator's own infrastructure, computer vision on existing CCTV for plant and site safety, failure prediction on critical assets, statutory evidence assembled continuously, and tender automation for procurement and bidding teams. SOC 2 and ISO 27001.

Why most enterprise AI never clears a public sector gate.

The blocker is rarely the model. It is data residency, procurement structure, and the ability to evidence what the system did and why.

01
Data cannot leave the country or the building
Sovereignty and classification rules rule out most SaaS analytics before a technical evaluation even begins.
02
Procurement is tender-driven
Solutions have to be specified, scored, and licensed in a form the tender process can actually accept.
03
Data sits in decades of separate systems
Operational history is spread across legacy databases, file shares, and paper, with no common identifier.
04
Every decision must be auditable
A recommendation without a traceable basis is not usable in a public accountability context.

Who owns this on your side, and what each of them gets

Director / General manager (operations)
Gets: A flagship digital programme with measured results to show the ministry and the board.
Stops worrying about: Picking a vendor that cannot clear security review, or a programme that produces slides and no numbers.
Head of safety / Chief vigilance
Gets: Sites and plants visible continuously; incidents counted; an evidence trail that stands up to inquiry.
Stops worrying about: An incident followed by an inquiry into supervision that was not there.
Head of procurement / Contracts
Gets: Tenders read, eligibility checked and compliance matrices drafted on the day of publication, for the bids the organisation issues and the ones it answers.
Stops worrying about: A procurement challenge, or a missed qualifying bid.

How a first deployment runs

Small, measured against your own numbers, and live before the quarter ends. Nothing is promised that the first site cannot show.

Stage 01 of 04

Week 1: scope within your security review

We agree the deployment model (on-prem, sovereign cloud or air-gapped), the data that stays inside, and a first scope: a set of assets, a handful of cameras or one tender portal. Measured against your own records.

Public infrastructure operator · sovereign deployment · 12 months

A public sector operator deployed PredCo air-gapped inside its own data centre, centralising asset, service, and compliance data that had been split across four systems and a decade of spreadsheets.

  • Deployed air-gapped: no data left the operator's network
  • Four source systems consolidated into one governed record
  • Audit evidence assembled on demand instead of per-request
  • Full technical specification supplied for the tender file
  • Every model decision logged and reproducible for review

Deployments are described without naming the operator. We are under confidentiality with every customer on this page.

TendersTND-2026-0418
Smart metering infrastructure, phase IITender draftReady for review
Generate allGenerating…POProcurement office
Tender draftPublish
Open tender · two-bid systemBid due 09 Dec 2026v3 · auto-saved
EditorPreviewSection 1 of 10
1Tender overviewPendingGenerated2 issuesApproved
Tender overview

1.1 Purpose of the tender

The Purchaser invites bids from eligible bidders for the supply, installation, testing, commissioning and five-year operation and maintenance of smart meters, a head-end system (HES) and a meter data management system (MDMS) under phase II of its smart metering programme.

1.2 Scope at a glance

  • 240,000 single-phase and 12,000 three-phase smart meters across three operating circles.
  • HES and MDMS hosted in the Purchaser's data centre, integrated with billing over open APIs.
  • Service levels, uptime and penalties as defined in Section 6.

1.3 Key dates

Publication of tender
04 Nov 2026
Pre-bid meeting
18 Nov 2026, 11:00
Last date for submission
09 Dec 2026, 15:00
Opening of technical bids
10 Dec 2026, 15:30
TimelineSpecial conditions revised06 NovStandard forms added06 NovLegal terms reviewed05 NovPricing schedule drafted05 Nov
Draft ready for review · 10 of 10 sections approved

Coverage out of the box

PredCo maintains validation libraries against the standards and rulebooks that apply to your sector.

GeM / CPPP procurementGFR 2017CVC guidelinesMeitY data localizationCERT-In directionsISO 27001IS / BIS standardsRTI-compatible audit trails

Questions PSU and public-operator teams ask.

Not covered here? Ask a PredCo engineer. We reply within one working day.

Yes. On-prem, sovereign cloud or air-gapped deployment is a standard choice, not a special tier. The data layer runs on your servers and camera detection on edge units at the site; nothing leaves your network unless you choose.

Scope a first deployment in government & psu.

  1. Tell us one site or plant and what you want to see first.
  2. A PredCo engineer replies within one working day.
  3. We walk through how the first six weeks would run, on your own cameras, equipment or documents.

Tell us about one plant in Government & PSU.

What you want to see first, and where. A PredCo engineer replies within one working day with how a first deployment would run.

No cost, no commitment. See our privacy policy.

  • SOC 2 and ISO 27001, with cloud, hybrid or on-prem deployment
  • 25+ plant deployments, international clients across multiple countries
  • A PredCo engineer replies within 1 working day; we sign an NDA before the first call