Sovereign data infrastructure for public operators.
Public sector undertakings and government operators carry the same operational problems as private industry, under stricter procurement, audit, and data residency rules. PredCo is built to deploy inside your perimeter and to be procured through the process you already run.
- 25+ plant deployments
- SOC 2 and ISO 27001
- Cloud, hybrid or on-prem

AI for government and PSU operators has to clear three gates before it does anything useful: it must run on the operator's own infrastructure, it must be procurable through a tender, and it must leave an audit trail an RTI request can follow. PredCo is built for those gates: on-prem or sovereign-cloud deployment, licensed software with a documented security posture, and every alert, prediction and declaration stored with its evidence. On top of that it does the operational work: site safety on existing cameras, asset failure prediction, statutory returns and tender reading.
PredCo is an industrial AI company headquartered in New Delhi, part of Panscience Innovations. For PSUs and public infrastructure operators it provides a sovereign data layer deployed on the operator's own infrastructure, computer vision on existing CCTV for plant and site safety, failure prediction on critical assets, statutory evidence assembled continuously, and tender automation for procurement and bidding teams. SOC 2 and ISO 27001.
Why most enterprise AI never clears a public sector gate.
The blocker is rarely the model. It is data residency, procurement structure, and the ability to evidence what the system did and why.
Who owns this on your side, and what each of them gets
The solutions most adopted in this sector
Public sector engagements usually begin with data centralization, then extend into the operational use cases it unlocks.
How a first deployment runs
Small, measured against your own numbers, and live before the quarter ends. Nothing is promised that the first site cannot show.
Week 1: scope within your security review
We agree the deployment model (on-prem, sovereign cloud or air-gapped), the data that stays inside, and a first scope: a set of assets, a handful of cameras or one tender portal. Measured against your own records.
A public sector operator deployed PredCo air-gapped inside its own data centre, centralising asset, service, and compliance data that had been split across four systems and a decade of spreadsheets.
- Deployed air-gapped: no data left the operator's network
- Four source systems consolidated into one governed record
- Audit evidence assembled on demand instead of per-request
- Full technical specification supplied for the tender file
- Every model decision logged and reproducible for review
Deployments are described without naming the operator. We are under confidentiality with every customer on this page.
1.1 Purpose of the tender
The Purchaser invites bids from eligible bidders for the supply, installation, testing, commissioning and five-year operation and maintenance of smart meters, a head-end system (HES) and a meter data management system (MDMS) under phase II of its smart metering programme.
1.2 Scope at a glance
- 240,000 single-phase and 12,000 three-phase smart meters across three operating circles.
- HES and MDMS hosted in the Purchaser's data centre, integrated with billing over open APIs.
- Service levels, uptime and penalties as defined in Section 6.
1.3 Key dates
- Publication of tender
- 04 Nov 2026
- Pre-bid meeting
- 18 Nov 2026, 11:00
- Last date for submission
- 09 Dec 2026, 15:00
- Opening of technical bids
- 10 Dec 2026, 15:30
Coverage out of the box
PredCo maintains validation libraries against the standards and rulebooks that apply to your sector.
Questions PSU and public-operator teams ask.
Not covered here? Ask a PredCo engineer. We reply within one working day.
Teams in adjacent industries also use PredCo
Scope a first deployment in government & psu.
- Tell us one site or plant and what you want to see first.
- A PredCo engineer replies within one working day.
- We walk through how the first six weeks would run, on your own cameras, equipment or documents.