Metals & Mining

Make remote, heavy, hazardous operations continuously compliant.

From open-cast mines to smelters and rolling mills, the cost of getting safety, environment, and reliability wrong is measured in lives, fines, and lost campaigns. PredCo brings AI-grade visibility to operations that have historically lived beyond it.

  • 25+ plant deployments
  • SOC 2 and ISO 27001
  • Cloud, hybrid or on-prem
AudienceMine ops · Smelter · Mill
FunctionsSafety · Environment · Reliability
Active programsServing mining & metals manufacturers
Avg pilot6 weeks
Replace with real photography for this page

AI for metals and mining does three jobs: it watches the sites a safety officer cannot reach, on the cameras already there; it predicts the ball-mill, conveyor and transformer failures that end a campaign; and it keeps stack, effluent, waste and CBAM data current for regulators and European buyers. PredCo runs all three on one data layer, with detection on an edge unit at the site and nothing promised beyond what the sensors and cameras can see.

PredCo is an industrial AI company headquartered in New Delhi. For steel, smelting, rolling and mining operations it runs computer vision on existing CCTV for PPE and exclusion zones across remote sites, predicts failures on mills, conveyors and furnaces, and assembles emissions, effluent and CBAM evidence continuously. Deployed cloud, hybrid or on-prem.

Three problems that define every audit in mining and metals.

Remote sites, high-energy processes, heavy equipment, and a growing regulatory burden: together they make this sector the hardest to digitize and the most rewarding when you do.

01
Safety officers can't be everywhere
Open-cast mines and large plant footprints mean supervision relies on goodwill and post-incident reporting.
02
Asset failures shut campaigns
A single ball-mill bearing failure or trafo trip costs days of campaign output and pulls forward maintenance windows.
03
Environmental scrutiny is intensifying
CPCB and state PCB monitoring, plus EUDR and CBAM for exporters, mean environmental data is now externally read.
04
Audit prep eats engineering capacity
Sustainability assurance, IATF/ISO surveillance, and customer-driven audits stack on top of each other quarterly.

Who owns this on your side, and what each of them gets

Head of safety / Mines manager
Gets: Open-cast benches, haul roads and furnace floors visible from one screen; near-misses counted per shift and per contractor.
Stops worrying about: A fatality on a site he visits once a month, and the DGMS inquiry after it.
Head of maintenance / Plant engineering
Gets: Mill, crusher and conveyor failures seen weeks out; campaigns that end on the planned date.
Stops worrying about: An unplanned stop on the one asset with a six-month lead time.
Environment & sustainability head
Gets: CPCB, CBAM and customer ESG returns built from live data instead of a quarterly scramble.
Stops worrying about: A consent-to-operate notice, or a European customer defaulting to the worst-case carbon value.

How a first deployment runs

Small, measured against your own numbers, and live before the quarter ends. Nothing is promised that the first site cannot show.

Stage 01 of 04

Week 1: one site, the worst-lit zones first

Two to four existing cameras on the haul road, the crusher house or the furnace floor; or the three rotating assets whose failure ends a campaign. Measured against your own incident and downtime logs.

Integrated steel plant · 4 sites · 12 months

A leading integrated steel producer deployed PredCo across four plants to tackle safety incidents, unplanned downtime on rotating equipment, and CBAM readiness for European exports.

  • Recordable incidents: −61% YoY across four plants
  • Ball-mill unplanned downtime: 14.3 hrs/wk → 4.1 hrs/wk
  • CBAM submission ready 7 months ahead of regulatory deadline
  • CPCB monitoring breaches: zero in the second half
  • Platform payback achieved in month 8 of year one

Deployments are described without naming the operator. We are under confidentiality with every customer on this page.

MaintenanceCluster 1
Maintenance records and predictions
MTMaintenance
Cluster 1 · 6 machines
Failure risk from sensor history, refreshed every 15 minutes.
Last 90 days Refresh
Maintenance records and predictionsUpdated 14:15
MachineLast serviceNext serviceFailure
prob.
Predicted
failure
Status
M1 Compressor 120 Aug20 Nov5%15 JanHealthy
M2 Mixing head15 Jul02 Nov12%10 DecWarning
M3 Hydraulic press05 Aug05 Nov7%01 JanHealthy
M4 Storage tank B10 Jul10 Nov27%26 OctCriticalWork order raised
M5 Conveyor drive25 Aug01 Nov9%01 DecWarning
M6 Cooling pump12 Sep12 Dec3%20 FebHealthy
Plant layoutCluster 1
FormingAssemblyUtilitiesTank farmM1M2M3M4M5M6
Storage tank BMachine IDM4Failure prob.27%Next service10 Nov
M4 · Storage tank B · tank pressure forecast Actual Predicted ThresholdPressureTemperature
16018020022023 Oct24 Oct25 Oct26 Oct27 OctThreshold 200 kPaNow · 25 Oct 12:00
26 Oct · 18:00 Predicted 200.1 kPaCrosses threshold in 30 h
Process vision · every 5 minKiln cameraLine 2 · burner zone
Kiln camera frame, coal break detected
Coal break96.9% · 14:05
Kiln camera frame, hanging slag detected
Hanging slag99.0% · 14:10
Kiln camera frame, blowing down detected
Blowing down96.6% · 14:15
Kiln camera frame, falling chunks detectedLatest
Falling chunks94.9% · 14:20
Work order WO-2291 raised. Storage tank B · planner notified.

Coverage out of the box

PredCo maintains validation libraries against the standards and rulebooks that apply to your sector.

CPCB / SPCB emission normsMoEFCC EIAMines Act 1952 (India)Factories Act 1948EU IED & BREFCBAM (EU)EUDR (EU)ISO 45001ISO 14001ISO 50001MSHA (US)DGMS guidelines (India)

Questions mine and plant heads ask.

Not covered here? Ask a PredCo engineer. We reply within one working day.

Yes. Detection and sensor analysis run on an edge unit at the site, so a poor link only delays the summary, not the alert. Many sites run fully on-prem and send a daily digest.

Scope a first deployment in metals & mining.

  1. Tell us one site or plant and what you want to see first.
  2. A PredCo engineer replies within one working day.
  3. We walk through how the first six weeks would run, on your own cameras, equipment or documents.

Tell us about one plant in Metals & Mining.

What you want to see first, and where. A PredCo engineer replies within one working day with how a first deployment would run.

No cost, no commitment. See our privacy policy.

  • SOC 2 and ISO 27001, with cloud, hybrid or on-prem deployment
  • 25+ plant deployments, international clients across multiple countries
  • A PredCo engineer replies within 1 working day; we sign an NDA before the first call