Plant Operations

Cut energy per unit, line by line, and report it without spreadsheets.

PredCo gives plants the per-line, per-asset, per-product energy picture they have never had, and ties it directly into ISO 50001, PAT, and carbon reporting.

  • 25+ plant deployments
  • SOC 2 and ISO 27001
  • Cloud, hybrid or on-prem
Use casePlant Operations
Primary userEnergy + Plant Ops
Frameworks6
Avg saving12% kWh / unit
EnergyPlant 1Line 2
Energy and emissions
EMEnergy manager
Line 2 · Foaming cluster
Metered every 15 s across 5 machines, compared with the 4-week baseline.
Today7 days30 days
Export
Energy today↓ 4.0%
5,740kWh
Baseline 5,980 kWh
Specific energy↓ 2.2%
3.03kWh / unit
Target 3.10 · 1,892 units
Peak demand95%
1,186kW
Contract 1,250 kW
CO₂e this month↓ 3.1%
412t
580 MWh · 0.71 kg / kWh
Production vs energy by machine Units produced Energy, kWh
001250.4k2500.8k3751.2k5001.6kUnitskWh
4121,180M1 2.86 kWh/u
3861,090M2 2.82 kWh/u
4551,320M3 2.90 kWh/u
2981,010M4 3.39 kWh/u
3411,140M5 3.34 kWh/u
Energy by machineToday · kWh
5,740kWh today
  • M11,18020.6%
  • M21,09019.0%
  • M31,32023.0%
  • M41,01017.6%
  • M51,14019.9%
Demand today · kW Today Forecast Baseline Contract
8001,0001,2001,40007:0008:0009:0010:0011:0012:0013:00Contract 1,250 kWNow 11:081,284 kW · 11:201,212 kW
Demand advisorLive
Contract demand1,250 kW
Peak so far1,186 kW · 11:08
Headroom now64 kW
Load factor, today0.81
Forecasting the next 2 hours…
Peak demand in 12 min

1,284 kW at 11:20, 34 kW over contract

Shift M4 start by 20 min
M4 start11:10 → 11:30
Forecast peak1,284 → 1,212 kW
Apply scheduleDismiss
Schedule applied

Peak now 1,212 kW, 38 kW of headroom

M4 start moved by 20 min
M4 start11:30
Shift outputUnchanged
Sent to line supervisorUndo
Schedule updated. Peak avoided, est. 6% lower demand charge.
kWh / unit −12%
PAT compliance 100%

Energy management software for a plant breaks the utility bill down to the line, asset and product that consumed it, flags drift and anomalies as they happen, and assembles the ISO 50001, PAT and Scope 2 evidence from the same metered data. PredCo does this on existing sub-meters and plant systems, with an audit-grade trail.

PredCo is an industrial AI company headquartered in New Delhi that gives plants a per-line, per-asset and per-product energy picture from the meters and systems they already have, and files ISO 50001, PAT and Scope 2 evidence from the same source data instead of spreadsheets.

Energy bills move quarterly. The decisions that drive them happen every minute.

Most plants see monthly utility bills and yearly audits. Neither resolution is high enough to manage energy as an operational variable.

01
Aggregate billing hides waste
A monthly kWh figure across a whole plant tells you nothing about the line, shift, or asset that's wasting.
02
Manual audits are expensive and stale
External energy audits are a $50k+ snapshot of one moment. Patterns change before the recommendations are implemented.
03
PAT and SECI compliance is paperwork
Indian PAT targets are real. The reporting workflow is manual and burdensome.
04
Carbon and energy aren't joined up
Sustainability disclosures need bottom-up data. Energy data hasn't been bottom-up.

Meter, attribute, predict, disclose.

Click through the stages to see what happens at each one.

Stage 01 of 04

Meter at line / asset level

Sub-metering with existing CTs/PTs and edge gateways. Capture per-asset signatures.

Energy as a first-class operational metric.

Real-time energy fabric
Live kWh, kVAr, power factor: per line, per asset, per product.
Per-unit benchmarking
Identical lines across plants compared like-for-like.
Anomaly + drift
Energy fingerprint shifts often precede mechanical failure.
Scope 2 attribution
Auto-attribute Scope 2 emissions to product and customer for downstream reporting.
PAT / SECI / ISO 50001
Filed-ready exports for Indian and global frameworks.
Audit-grade trail
Every meter, every reading, every aggregation: versioned.

What teams measure after go‑live

−12%
kWh per unit
Median across deployed plants in year one.
100%
PAT compliance
On time, every cycle, for every designated consumer.
6 wks
Sub-meter to insight
From kickoff to actionable per-asset data.
11 mo
Payback
Median time-to-payback on energy program.

Figures are indicative ranges from deployment programs of comparable scope. Your baseline determines the actual number, and we size it with you before kickoff.

Built for the rulebooks you operate under
ISO 50001PAT (Perform Achieve Trade): BEE IndiaSECI mandatesGHG Protocol Scope 2CBAM (EU)IEC 61557

Questions energy managers ask.

Not covered here? Ask a PredCo engineer. We reply within one working day.

It attributes consumption to lines, assets and products instead of one aggregate bill, detects drift and waste as it happens, and produces the ISO 50001, PAT and carbon evidence from metered data rather than spreadsheets.
Book a working session
Now onboarding new deployments

Bring one problem. We'll show you the deployment.

A 30-minute working session with our engineering team. No slideware. Bring a real operational problem and leave with a concrete view of what a PredCo deployment looks like for your plant.

25+
Plant deployments
SOC 2
PredCo and Panscience Innovations
On-prem
Sovereign deployment supported